Dyna grip stay cable system for the zevenaar bridge the zevenaar stay cable bridge netherlands the zevenaar bridge is part of the betouweroute project a new railway line for transporting freight.
Dsi stay cable system.
Stay cable systems dyna grip stay cable system the dyna grip stressing anchorage consists of an anchor block in which the strands are anchored by high fatigue 3 part wedges.
Strand installation is.
The outer sheathing is welded to its required length directly on site using heated tool welding and is then lifted into an inclined position.
Dyna grip stay cable systems dsi has developed various methods to optimize and simplify cable installation procedures depending on site specific space and time constraints.
A ring nut is threaded onto the anchor block to transmit the cable force into the structure via the bearing plate.
Any kind of mitigation level in terms of specific customized threat scenarios and the required strength of the protection system can be taken into consideration.
Strands are uncoiled either from wooden reels or are provided reel less.
Dyna grip stay cable system the dyna grip stay cable system can be easily adjusted or upgraded if required.
Highly effective protection material can be easily adjusted to requirements and threats numerical simulation and physical testing is carried out using.
The new line begins at rotterdam s europoort and ends near arnhem on the dutch german border.
Dyna grip stay cable system any kind of mitigation level in terms of specific customized threat scenarios and the required strength of the.
They are installed and stressed one by one.
A ring nut is threaded onto the anchor block to transmit the cable force into the structure via the bearing plate.
Dyna grip stay cable system dsi s cable hardening system has been developed to protect the stay cables effectively against multiple threat scenarios for all stay cable sizes.
Dyna grip stay cable systems the outer sheathing is welded to its required length directly on site using heated tool welding and is then lifted into.
The length of the vandalism protection pipe can be adjusted to project specific requirements to achieve any requested height above the bridge deck level.